Home
Have a peace of mind and live a minimalist lifestyle
Office
Maximize profit with a comfortable workspace
Retail Store
An artistic and efficient space for modern retailing
Guard House
Portable and utilitarian area for your security team
Military Camp
Robust & portable for military personnel and storage
Hospital
Efficient for medical and emergency requirements
Restaurant
Stylish & modern structure to increase attraction
School
Combined into comfortable classrooms
https://www.youtube.com/watch?v=hNGTw-fq9uk
Beautiful. Sustainable.
Make a change for our future generations by reducing our carbon footprint with a sustainable living space
Structure System
An overview of our prefabricated container cabin’s structure system
Container Roof
Color Steel Sheet
Roof Frame Structure
Ceiling
Insulation
Container Floor
PVC Floor
Cement Particle Board
Floor Frame Structure
Sub Floor
Glass Wool
Corner Post
Every corner posts are galvanized. The roof and floor are bolted together with corner post.
Wall Panels
A choice of insulation material according to requirements ranging from thickness of 50mm/75mm/100mm and different density of 50kg/m³ or 45kg/m³.
Door
The steel door provided is suitable for vertically long or short wall.
Window
A selection of security windows of UPVC sliding window or common window
Electrical System
Switch and power sockets are provided along with LED lighting.
Fast. Easy.
Waste no time at all with modular and easy to assemble container cabin system
Fast Assembly & Installation
We design and produce container cabin for fast assembly and installation by our trained professionals. It can be completed in within 6 simple steps.
Step 1
Unboxing
30 minutes
Requires only 1 person to unpack from the shipment package to arrange panels and accessories for convenience during assembly.
Step 2
Corner Posts
30 minutes
3 person are recommended to assemble the corner posts.
Step 3
Roof
60 minutes
4 person are required to assemble the container roof and locking on the corner posts.
Step 4
Wall Panels
60 minutes
Requires only 2 person to assemble all sides of the wall panels.
Step 5
Door & Window
30 minutes
Requires 2 person only to install all door and windows into the required positions.
Step 6
Completion
A final inspection on the assembly and installation.